Features & mechanics

Every system, every way to win, and two fares.

Everything the game simulates, everything you can do to it, and every way it lets you win — counted from the engine, not from a wish list, and set out on ticket stock. The free edition and the full edition run the same simulation. The only things that differ are how much city, how much history and how long. Full is $25 once, on Steam and on Mac and Windows; the two fares below are the whole of the difference.

$Free against full

Money buys more city. Never a better simulation.

The model does not know which edition it is running under, and a free run is not a degraded run. What is bounded is which metro, which mandate, which decade, and for how long. Everything on the third ticket is carried on both.

· Free Single ticket
FreeSteam demo · Mac & Windows
This week’s assignment One of thirteen metros · one of five mandates This week · changes in under a week, Monday 00:00 UTC
  • ✓
    One real metro and one mandate a week, drawn from thirteen metros and five briefs
  • ✓
    Present day, 2025 · five years in office, then the run ends
  • ✓
    Whatever this week’s mandate allows you to build
  • ✓
    A new assignment every Monday, 00:00 UTC — a run you have started keeps going
  • ×
    This week’s metro only, five years on the clock
  • ×
    Future expansions are not included

Long enough to open a line, watch it fill, feel the operating cost arrive, face an election and take a fare decision. The whole loop, once, on the same city and brief as everyone else playing free that week. Steam demo, or Interurban Free on Mac and Windows.

Get the free game
· Full Single ticket, no expiry
$25once · not a subscription
  • ✓
    79 metros — 54 US Census packs and 25 in Europe, Asia and South America
  • ✓
    8 decades, 1920 · 1950 · 1960 · 1975 · 1992 · 2010 · 2025 · 2040 — each one moves nine levers
  • ✓
    6 mandates, including the sandbox
  • ✓
    7 modes — metro, commuter rail, light rail, streetcar, BRT, bus, ferry — as the mandate allows
  • ✓
    No clock and no weekly rotation — pick anything, play as long as you like
  • ✓
    Mac, Windows and Steam — the packs live in the app, offline
  • ✓
    Every future expansion, at no further cost

One tier, one price: $25, once. Ten percent of every sale goes to pro-urban organisations; buy Mac or Windows direct and an extra 30% — Valve's cut on Steam — goes with it. The binary is the licence.

Get the full edition
= Carried on both Conditions of carriage
  • ✓
    The four-step demand model — generation, gravity distribution, nested-logit mode choice, hyperpath assignment, solved to equilibrium
  • ✓
    Inherited rail wherever the pack has it — the agency’s GTFS lines run, cost money, and carry riders on day one. Local bus stays decoration
  • ✓
    Passenger ferry wherever the pack has a shore — a harbour, a Great Lake or a navigable river; a dock has to sit on the shore
  • ✓
    Easy, Medium and Hard — the same city, decade and mandate; how often the world interrupts, not which modes you may build
  • ✓
    Real data — Census 2020, ACS, LEHD LODES observed commute flows, FHWA HPMS, agency GTFS
  • ✓
    Fares — base, distance, transfers, time of day, concessions, passes
  • ✓
    Headways by period — AM peak, midday, PM peak, evening, night, weekend
  • ✓
    Express and skip-stop patterns, consist lengths
  • ✓
    Construction in years — design plus civil work, with schedule and cost risk
  • ✓
    Infill, rebuild in place, and a planning pencil — a stop on open track, a heavier alignment without deleting the line, a corridor committed as a package
  • ✓
    Fleet procurement, lead times and ageing
  • ✓
    Labour model and strikes
  • ✓
    Five station upgrades — second entrance, platform extension, step-free, retail, park-and-ride
  • ✓
    Bonds, credit ratings, subsidy by era
  • ✓
    Politics — approval, council, a board that votes, elections every four years, trust
  • ✓
    124 events in six families
  • ✓
    Land use that reacts to the network
  • ✓
    Six victory conditions, each set against the city you inherited
  • ✓
    231 achievements and twelve ranks — the ladder and the wall
  • ✓
    Undo and redo, autosave every month, shareable seeds
  • ✓
    The attribution panel and the local paper
  • ✓
    Deterministic from a seed — nothing calls Math.random()
10%

A tenth of everything this earns goes to pro-urban coalitions across the United States — the transit advocacy groups, the street-safety campaigns and the land-use reform organisations doing the unglamorous work of showing up to public meetings. It would be strange to make a living arguing that transit is worth building and give nothing to the people arguing for it where it actually gets decided. Why, and who · The case they are making.

1Every system

Fifteen systems, each on its own ticket, each naming the module that implements it.

A feature list with no citations is a wishlist. Every ticket carries the one figure that matters and the file it lives in, because the whole argument of this project is that you do not have to take its word — the engine is open source.

DemandSystem 01
4steps, solved to equilibrium

A four-step model seeded on observed flows.

Trip generation by purpose, gravity distribution pivoted on real commute flows rather than a fitted curve, nested-logit mode choice with car ownership in the nest, and frequency-based hyperpath assignment that reasons about headways and waits. Solved to equilibrium over crowding and road congestion, six periods a week.

demand.ts · distribution.ts · modechoice.ts · skim.ts · transitgraph.ts · assignment.ts · sim.ts

FaresSystem 02
6instruments, all live

Base, distance, transfers, time of day, concessions, passes.

Time-of-day pricing flattens the peak rather than only suppressing it; concessions reach behaviour and revenue through separate factors; a monthly pass is priced as a ceiling. Every fare rise is a resolution the board has to vote on.

economy.ts · skim.ts · riders.ts · politics.ts

OperationsSystem 03
6periods a week, per route

Three dials and a workforce.

Service level, wage ratio and maintenance funding, split across guideway, rolling stock, facilities and systems; staffing targets, missed runs, grievance that accumulates and a strike hazard convex in the shortfall. Headways by period — AM peak, midday, PM peak, evening, night, weekend — with consist lengths and express and skip-stop patterns.

policy.ts · economy.ts · types.ts (RoutePattern) — labour content from CRS R47900 and APTA

BuildingSystem 04
5alignments, each with its own cost curve

Construction takes years, and reloading cannot escape a bad draw.

Underground, elevated, surface, dedicated and mixed traffic, each with its own capital cost, speed ceiling and reliability. Design plus civil work is printed as months and years. An infill stop goes on open track without tearing the line up; a span can be rebuilt to a heavier alignment in place; a planning pencil lays a corridor and commits it as a package. Cost and schedule risk are drawn once at commit from the run’s own seeded stream.

construction.ts · infill.ts · rebuild.ts · blueprint.ts · constants.ts — design and procurement time, per mode

StationsSystem 05
5upgrades that move the model

Why agencies spend nine figures on a doorway.

A second entrance widens the walk catchment by a platform length; a platform extension takes longer consists; step-free access, a retail concession and park-and-ride each change a number the demand model reads. None of them is cosmetic.

upgrades.ts — a kilometre of walk access

FleetSystem 06
3years’ lead time on a metro car

Vehicles are ordered, not bought.

Three years for metro and commuter cars, a year for buses, longer in later decades; condition and mean distance between failures age with use, a mid-life overhaul buys back about half, and a spare ratio decides how much of the fleet is on the road on any given morning. Reliability feeds punctuality, which feeds perceived wait, which feeds ridership.

fleet.ts · transitgraph.ts

MoneySystem 07
8notches of credit rating, AAA to C

The books, the way agencies keep them.

Operating cost split the four ways the National Transit Database splits it; farebox recovery; federal, state and local subsidy with era-correct shares, including the end of federal operating assistance to large areas in 1998. Bonds carry a credit rating and a spread that follows it, and a repair backlog grows when you defer maintenance and bites when you do not.

economy.ts — the NTD four-function split, and a credit rating read off the books

PoliticsSystem 08
4years between elections

A board that votes, and refuses.

Public approval and council support move differently; the board votes on fare rises and borrowing and refuses both when it will not carry them; elections reset it from a blend of the old board and the result. Institutional trust changes your borrowing spread, your funding and how much scrutiny an overrun attracts.

politics.ts · trust.ts

EventsSystem 09
124events in six families

Nineteen fiscal, 23 political, 23 operational, 15 social, 25 exogenous, 19 opportunity.

One hundred and four are decisions with real branches and no dominant option; the rest simply happen to you. All are gated on the calendar and on real state: no federal grant in 1950, no derailment on a network with no track — and every one in force is shown, named, with what it is doing to the model. Easy, Medium and Hard remap how often they fire, not which ones exist.

events.ts · effects.ts · ripple.ts · challenge.ts (eventIntensityFor)

The living citySystem 10
2cities tracked: yours, and the no-build

Land use that answers the network.

Population and jobs move over a run in response to accessibility, and districts derive their own character annually from their own live census and employment numbers, so a residential neighbourhood can become a secondary centre while you play. The counterfactual is tracked alongside, so the game can say how much of the growth was yours — and station-area land value is a thing you can capture.

landuse.ts · districts.ts · land.ts

ExplanationSystem 11
4terms, and the residual printed

The panel that shows what it could not explain.

When ridership moves, the attribution panel says what moved it — service, fares, shocks, the city itself — and prints the part it could not explain rather than folding it into whichever term was largest. A per-station answer to “why does nobody board here?”, decomposed into the utility function, and a local paper that writes up the causation.

explain.ts · news.ts · outcomes.ts

Who ridesSystem 12
5income quintiles, each with its own values

Segments, not an average traveller.

Riders carry their own values of time, their own attitudes to a dirty platform, their own car ownership, and sentiment is broken out by segment so you can see which group you have been failing. Job access for the poorest quintile against the metro average is a mandate objective in its own right.

riders.ts · scenario.ts (equity)

ProgressionSystem 13
231plates on the honours wall

Six wins, six mandates, twelve ranks.

Victory conditions computed from the city you inherited, mandates with their objectives in plain figures, a blended score of eight components with the arithmetic shown, and a ladder of the twelve jobs of a railway career. A rank is earned on the blended score alone; plates count the kilometres and lines you built, not the ones the agency already ran. Runs are recorded across cities as a career. The ladder and the wall →

victory.ts · scenario.ts · score.ts · ranks.ts · achievements.ts · career.ts

The interfaceSystem 14
8×speed, with standing policies answering for you

Getting out of your way.

A seven-step walkthrough: read the map, site two stations, join homes to jobs, lay track, run a line, start the clock, see who boards — and Field Notes, each verified against the code that produces it. The overlay stays on while you build; a load ribbon thickens with crowding; 1× lets you watch the trains and 2× and up is the ridership ledger. Undo and redo can rewind a month; autosave every month; a named save asks before it overwrites. Standing policies answer routine decisions at 8×, and an escape ladder closes exactly one thing at a time.

Coach.tsx · GameView.tsx · map.ts (loadRibbonScale) · save.ts · autopilot.ts

The dataSystem 15
79metros, from open sources, cited

One script, no API key, reproducible.

Census 2020 PL94-171, ACS 2018–2022, LEHD LODES8 2022, FHWA HPMS and TIGER/Line, with each agency’s own published GTFS feed where one exists. The whole simulation is deterministic from a seed: nothing anywhere calls Math.random().

tools/ · packFormat.ts · rng.ts

2Every way to win

Six victories, each set against the city you were handed. Winning does not end the game.

A fixed target is trivial in New York and impossible in Omaha, so every bar is computed once, at the start of the run, from the real city in the real decade — with an absolute floor so that doubling a rounding error is not a win. Reaching one is recorded, written up by the paper, and the run goes on. The sustained ones must be held for a full year, and the clock resets on any day the condition slips.

Victory · 1Sustained
6%of every regional trip, at most — 1% at least

Transit Capital

Reach the inherited system’s day-one transit share, and hold it for a year.

The bar is what the rail you took over actually carried on the first solve — or the published NTD share, if the pack has no playable rail — floored at 1% so matching almost nothing is not a win and capped at 6%, which is top-ten in the United States. Scored as region-wide share of every trip, not commutes and not downtown.

victory.ts — a floor of 1% and a cap of 6%, measured against the share you inherited

Victory · 2Instant
10%less peak congestion than the no-build

Roads Unclogged

Cut peak road congestion 10% against what the region would have without your network.

Measured against the no-build counterfactual, not against the day you started, because the region grows and holding congestion flat through growth is the harder achievement. The volume-delay curve is quartic, so removing a tenth of peak cars does far more than a tenth of good — which is the whole case for peak-hour transit.

victory.ts — a tenth off peak congestion; outcomes.ts

Victory · 3Instant
20,000net tonnes of CO₂ a year, at least

Carbon Cut

Avoid 0.02 net tonnes of CO₂ a year per resident — at least 20,000 tonnes.

Net, after charging the network for what it burns. A diesel bus at 20% occupancy is worse per passenger-km than a car with one person in it, so coverage bought with empty buses moves this number the wrong way. Scaled to the metro’s population so the bar means the same in Boise and in Chicago.

victory.ts — 0.02 t a resident, with a 20,000 t floor

Victory · 4Sustained
65%satisfied, 80% on time, and a surplus — all at once

Held the Line

Finish a year in surplus with rider satisfaction above 65% and on-time performance above 80%.

All three at once, which is the hard part: the cheapest route to a surplus is cutting the service that produces the other two. The two thresholds sit around the upper quartile of what US agencies report. The surplus includes subsidy, because essentially no US system covers its operating cost from fares and the game does not pretend otherwise.

victory.ts — a surplus held across the trailing year

Victory · 5Instant
60%more of the metro within a walk of a stop

Within Reach

Put 60% more of the metro within walking distance of a stop than you inherited — at least a tenth of it, at most nine-tenths.

Coverage and farebox recovery pull against each other, always. Getting here means choosing to serve people who will never pay for themselves, which is a decision rather than an optimisation. A tenth of a US metro within a kilometre of a stop is two long rail lines through the core — further than most real US rail systems reach.

victory.ts — a tenth of the metro, at most nine-tenths

Victory · 6Instant
10%off the average regional commute, every mode

Ten Minutes Back

Cut the average regional commute by 10%.

The only target measured on what every resident experiences rather than on what your riders experience: across every mode, including the people who never board a train, because a network that takes cars off the road shortens the drive for everyone left on it.

victory.ts — commuteCut; outcomes.ts avgCommuteMin

3The mandates

Six briefs. Each restricts the tool you may reach for and states its objectives in plain figures.

Completing every objective is recorded as “Mandate complete” and the board renews your appointment. Targets are tuned to a metro of about three million people, which is why each city carries a difficulty. Ridership is weekday linked trips; coverage is the union of walk catchments around open stops; equity is 45-minute job access for the lowest income quintile over the metro average.

Mandate · 1Punishing
70,000riders on an average weekday

Metro Only

metro

Heavy rail and nothing else. Every station costs more than a year of bus operations, so the whole game is capital-bound.

  • 35 km² within walking distance of a stop
  • 45% of operating cost recovered at the farebox
  • 0.4% transit mode share in the AM peak
  • Repair backlog held under $250m

$900m cash · $6.0bn borrowing capacity · realistic events · balanced fiscal regime

Mandate · 2Demanding
80,000riders on an average weekday

Rail Network

metro · commuter · lightrail

Three technologies with three cost curves; the game is deciding which belongs on which corridor.

  • 45 km² within walking distance of a stop
  • 40% recovered at the farebox
  • Job access for the poorest quintile at 85% of the metro average
  • Repair backlog held under $300m

$750m cash · $4.5bn capacity · realistic · balanced

Mandate · 3Standard
90,000riders on an average weekday

Full Multimodal

metro · commuter · lightrail · tram · brt · bus · ferry

The recommended way to play and the full problem: rail where the volume justifies it, bus where it does not.

  • 70 km² within walking distance of a stop
  • 30% recovered at the farebox
  • 0.6% transit mode share in the AM peak
  • Job access for the poorest quintile at 90% of the metro average

$600m cash · $4.0bn capacity · realistic · balanced

Mandate · 4Demanding
60,000riders on an average weekday

Bus First

brt · bus

Service across the whole metro within a year for the price of a kilometre of subway — and then the drivers, every year, forever. Operating cost is the enemy.

  • 100 km² within walking distance of a stop
  • 25% recovered at the farebox
  • Public approval held at 60%

$220m cash · $900m capacity · realistic · austerity

Mandate · 5Demanding
50,000riders on an average weekday

Streetcar City

tram · bus

The way a city was built before the war: cheap track in the street and no subsidy to fall back on. The farebox is the budget. Best in 1920 or 1950.

  • 50 km² within walking distance of a stop
  • 70% recovered at the farebox
  • Repair backlog held under $120m

$300m cash · $1.2bn capacity · realistic · balanced

Mandate · 6Full edition
300,000riders on an average weekday

Sandbox

every mode

Effectively unlimited money and nothing random happening to you. No losses, no clock, no deadline.

  • 200 km² within walking distance of a stop
  • 25% transit mode share in the AM peak
  • Job access for the poorest quintile at 95% of the metro average
  • Crowding under 10% of passenger-km

$50bn cash · $500bn capacity · events off · boom

scenario.ts — the six briefs and what each one asks for. Equity reads as zero until the network carries 10,000 riders; the repair-backlog and crowding ceilings are gated on having built something to maintain.

Losing · 1

Insolvency

Three months underwater with no borrowing capacity left at your credit rating, and the agency is placed in receivership.

Losing · 2

Removal

Five consecutive deficit years — three with a hostile board — or support below 7% after your first year. The board meets and warns you twice, a quarter apart, before it votes.

Losing · 3

A missed deadline

A mandate objective with a deadline, unmet when it falls, and the board appoints someone else to finish it. The sandbox has none of these; that is the point of it.

scenario.ts — months insolvent, deficit years, board support, and the warnings owed before a removal. The free edition’s five-year clock is a fourth ending, enforced by the host and recorded in the career as “clock”, not as a dismissal.

★ Rank and badges The ladder and the wall
12ranks, the jobs of a railway career — section hand to president
231plates in nine categories and three tiers
±60→5%decision confidence, narrowing with every rank

Ranks open on the blended score — eight components with the arithmetic shown — and each one narrows the band around what your decisions actually do. The wall is 231 things a transit agency would be proud of, or quietly ashamed of, each with what it takes and why it is worth having.

  • Bus Route
  • Step-Free
  • Farebox Positive
  • Seven Figures
  • A Transit City
  • Interurban
Every rank and every plate →