Interurban / 79 metros / Madrid

Community of Madrid · EuropeOSM land-use zonesSteam · Mac · Windows

Madrid

A radial Metro that grew faster than almost any other in Europe after 1995, into a city that still commutes by car at the edge.

Existing transit 12 rail lines · 250 stops · Metro de Madrid / CRTM + EMT · 59 bus routes drawn, not counted
Madrid: the 12 rail lines and 250 stations the pack starts with, with 59 bus routes drawn underneath, over the metro's water and major roads001 · Estacion de Atocha - Moncloa10 · Plaza de Cibeles - Palomeras102 · Estacion de Atocha - Estacion el Pozo113 · Mendez Alvaro - Plaza de Ciudad Lineal115 · Avenida de America - Barajas118 · Glorieta de Embajadores - Avenida de la Peseta124 · Glorieta de Cuatro Caminos - Lacoma125 · Mar de Cristal - Hospital Ramon y Cajal128 · Glorieta de Cuatro Caminos - Barrio del Pilar132 · Moncloa - Hospital la Paz133 · Plaza del Callao - Mirasierra138 · Plaza de Cristo Rey - Colonia San Ignacio de Loyola14 · Plaza de Conde de Casal - Avenida de Pio XII146 · Plaza del Callao - los Molinos147 · Plaza del Callao - Barrio del Pilar152 · Avenida de Felipe II - Mendez Alvaro17 · Plaza Mayor - Colonia Parque de Europa176 · Plaza de Castilla - las Tablas Sur19 · Plaza de Cataluña - Plaza de Legazpi2 · Plaza de Manuel Becerra - Avenida Reina Victoria20 · Puerta del Sol/sevilla - Pavones21 · Paseo del Pintor Rosales - Barrio el Salvador23 · Plaza Mayor - Villaverde Cruce24 · Estacion de Atocha - Estacion el Pozo25 · Plaza de España - Casa de Campo27 · Glorieta de Embajadores - Plaza de Castilla28 · Puerta de Alcala - Barrio de Canillejas3 · Puerta de Toledo - Plaza de San Amaro30 · Avenida de Felipe II - Pavones31 · Plaza Mayor - Aluche32 · Plaza de Tirso de Molina - Pavones34 · Plaza de Cibeles - las Aguilas35 · Plaza Mayor - Carabanchel Alto38 · Plaza de Manuel Becerra - las Rosas39 · Plaza de España - Colonia San Ignacio de Loyola44 · Plaza del Callao - Marques de Viana45 · Plaza de Legazpi - Avenida Reina Victoria49 · Plaza de Castilla - Pitis53 · Puerta del Sol/sevilla - Arturo Soria56 · Diego de Leon - Numancia6 · Plaza de Tirso de Molina - Orcasitas60 · Plaza de la Cebada - Orcasitas61 · Moncloa - Narvaez70 · Plaza de Castilla - Alsacia77 · Plaza de Ciudad Lineal - Colonia Fin de Semana83 · Moncloa - Barrio de la Paz85 · Estacion de Atocha - Butarque9 · Puerta del Sol/sevilla - HortalezaA · Moncloa - Campus SomosaguasC1 · Circular 1 -C2 · Circular 2 -E1 · Plaza de Cibeles - la PesetaE2 · Avenida de Felipe II - las RosasE3 · Avenida de Felipe II - ValderrivasE4 · Avenida de Felipe II - ValdebernardoE5 · Manuel Becerra - el CañaveralG · Moncloa - Ciudad UniversitariaS10 · Plaza Castilla - N. MinisteriosSE3 · Batan - Lucero1 · Pinar de Chamartín-Valdecarros10 · Hospital Infanta Sofía-Puerta del Sur11 · Plaza Elíptica-La Fortuna12 · MetroSur2 · Las Rosas-Cuatro Caminos4 · Argüelles-Pinar de Chamartín5 · Alameda de Osuna-Casa de Campo6 · Circular7 · Hospital del Henares-Pitis8 · Nuevos Ministerios - Aeropuerto T49 · Paco de Lucía-Arganda del ReyR · Opera-Príncipe Pío10 km
  • Local bus
  • 1 · Pinar de Chamartín-Valdecarros
  • 10 · Hospital Infanta Sofía-Puerta del Sur
  • 11 · Plaza Elíptica-La Fortuna
  • 12 · MetroSur
  • 2 · Las Rosas-Cuatro Caminos
  • 4 · Argüelles-Pinar de Chamartín
  • 5 · Alameda de Osuna-Casa de Campo
  • 6 · Circular
  • 7 · Hospital del Henares-Pitis
  • 8 · Nuevos Ministerios - Aeropuerto T4
  • 9 · Paco de Lucía-Arganda del Rey
  • R · Opera-Príncipe Pío

Bus, Metro — lines, stops and colours from the operating agency's published GTFS. Water and roads: OpenStreetMap (ODbL), Overpass extract of the playable core. 2,030,103 residents in 156 zones, pack 2020.

#Facts, figures, history

Madrid, as the pack records it.

Population by decade, a sourced metro series scaled to the 2020 pack.
YearPopulation
1950521,445
1960733,671
19701,080,120
19801,304,782
19901,354,075
20001,538,307
20101,775,440
20202,030,102

The pack's sourced population series runs from 521,445 residents in 1950 to 2,030,102 in 2020.

The zones cover 861 km², about 2,357 residents per km², with 933,851 jobs at the workplace.

The pack seeds 12 playable rail/BRT/ferry lines, 59 bus lines drawn on the map.

Difficulty is Demanding.

✓What winning here takes

Six ways to win Madrid, each set by Madrid.

There is no score to beat. Each condition is computed from the metro as you inherit it, with the engine's own arithmetic; these are the bars the game will set on day one in Madrid, in 2025. The blue tick is where the city stands today; the red band is where it has to get to. The run continues after you win.

  1. Transit Capitalheld for a year

    1.5%today · published share; the game counts from day one’s AM peak
    2.0%needed · 0.5 points more than you inherit, for a year

    The region's existing system carries about 1.5% of all trips. The operating rail is in the model, and matching it is not a win: in the game the bar is 0.5 points of AM-peak share more than that system carries on day one, never under 1%, held for a year. Nothing counts until a line of your own carries riders.

  2. Roads Unclogged

    0%today · relief of your own, before you build
    10%needed · cut in peak congestion

    Against what the region would have without transit, not against the day you started — the region grows, and holding congestion flat through growth is the harder achievement. Progress counts from what the inherited system already cuts; where that is already 10% or more, the bar is 1 point more. Nothing counts until a line of your own carries riders.

  3. Carbon Cut

    0ttoday · net tonnes added to what you inherit
    40,602tneeded · net tonnes of CO₂ a year, over the inherited system’s

    Scaled to this metro's 2,030,103 residents at 0.02 tonnes each — roughly what moving a few percent of the region's driving onto rail saves, after the trains are charged for their own power. Counted on top of what the inherited system already avoids. Nothing counts until a line of your own carries riders.

  4. Held the Lineheld for a year

    0%today · on time, before a train of yours runs
    80%needed · on time · 65% satisfied · a year in surplus · 10,000 riders on your own lines

    All three at once. The cheapest route to a surplus is cutting the service that produces the other two, so this is the condition that cannot be bought. And with 10,000 weekday boardings on lines you opened: a healthy system you took over is not a line you held.

  5. Within Reach

    0%today · added to what you inherit
    10%needed · of the metro within a kilometre of a stop

    The operating rail is already in the model, so coverage does not start at nothing. The bar is a tenth of the metro within a walk, or 60% more than you inherit, whichever is higher. Nothing counts until a line of your own carries riders.

  6. Ten Minutes Back

    0%today · cut so far
    10%needed · off the average regional commute

    Measured on every resident, including the people who never board a train — a network that takes cars off the road shortens the drive for everyone left on it. The day-one average is the model’s first solve.

Every bar is set above what you inherit, and where the pack seeds operating rail nothing counts until a line of your own carries riders. Carbon Cut's bar is 0.02 net tonnes a year for each resident, floored at 20,000, on top of what an inherited system already avoids. Transit Capital, coverage and the commute are taken from the network you inherit: where the pack seeds operating rail, Transit Capital asks 0.5 points of AM-peak share more than that system carries on its first solve, never under 1%; where it does not, Transit Capital uses the model's default present-day share (floored at 1% and capped at 6%) on a network of your own, and coverage starts from nothing. The gauges' Transit Capital tick is that default either way.

What you are given

What you are given

Every one of Madrid's 156 zones arrives with derived numbers attached: resident population from OSM land-use shares of a sourced 2020 metro series, jobs allocated from the land-use mix, and a gravity-model home-to-work matrix. These are not US Census tracts and not LODES commute pairs — the pack says so on its provenance string.

Work trips are a gravity model from those land-use shares, labelled DERIVED, not a census commuting matrix. The streets, water and operating lines are still observed: OpenStreetMap and the agency's published GTFS.

Madrid's operating rail — 12 lines, 250 stops — is seeded into the playable network from the agency's published GTFS: the lines run, they cost money to operate, and riders board them. Local bus is drawn on the map and stays decoration.

What makes it hard

What makes Madrid hard

Demanding. A real city with real structure, and enough density in the middle to reward a trunk line. You are inheriting a system, which means you inherit its shape and its operating cost as well as its riders.

And the decade changes the problem, not the vehicle list. Madrid in 1960 is a different city from Madrid in 2025: the pack's sourced population series (UN World Urbanization Prospects and national census) is scaled onto the 2020 zone map, so the rivers and the rail yards stay where they are.

Madrid is in the full edition. The free game rotates through thirteen metros so you can check the model on a city you know before taking anyone's word about the other sixty-six. The full edition, $25 once, opens all seventy-nine. Buy Mac or Windows direct and an extra 30% — Valve's cut on Steam — goes to pro-urban organisations.

Play Madrid Full edition

Sources

How the model turns these into riders, with every mechanic named →