Interurban / 79 metros / Los Angeles

California · PacificCensus 2020 tractsFree rotationSteam · Mac · Windows

Los Angeles

Denser than people think and more polycentric than anywhere. Building the largest transit expansion in America, into traffic nobody can beat.

Existing rail 6 rail lines · 113 stops · LA Metro
Los Angeles: the 6 rail lines and 113 stations the pack starts with, over the metro's water and major roadsMetro A LineMetro C LineMetro E LineMetro K LineMetro B LineMetro D Line25 km
  • Metro A Line 1990
  • Metro C Line 1995
  • Metro E Line 2012
  • Metro K Line 2022
  • Metro B Line 1993
  • Metro D Line 1993

Light rail, Metro — lines, stops and colours from the operating agency's published GTFS, opening years where the feed or the record gives one. Water: Census TIGERweb hydrography. Roads: FHWA HPMS, the busiest classes. 10,014,009 residents in 2,495 census tracts, Census 2020.

#Facts, figures, history

Los Angeles, as the pack records it.

Population by decennial census, as recorded in the pack.
YearPopulation
1920936,455
19302,208,492
19402,785,643
19504,151,687
19606,038,771
19707,041,980
19807,477,503
19908,863,164
20009,519,338
20109,818,605
202010,014,009

The pack's census series in Los Angeles runs from 936,455 residents in 1920 to 10,014,009 in 2020.

The census tracts cover 10,516 km², about 952 residents per km², with 4,806,038 jobs at the workplace.

The pack seeds 6 playable rail/BRT/ferry lines. Metro A Line opened in 1990; Metro K Line opened in 2022.

Difficulty is Punishing.

✓What winning here takes

Six ways to win Los Angeles, each set by Los Angeles.

There is no score to beat. Each condition is computed from the metro as you inherit it, with the engine's own arithmetic; these are the bars the game will set on day one in Los Angeles, in 2025. The blue tick is where the city stands today; the red band is where it has to get to. The run continues after you win.

  1. Transit Capitalheld for a year

    2.3%today · published share; the game uses day one
    2.3%needed · hold the inherited share, for a year

    The region's existing system carries about 2.3% of all trips. The operating rail is in the model; in the game the bar is what that system carries on day one, held for a year.

  2. Roads Unclogged

    0%today · relief before you build
    10%needed · cut in peak congestion

    Against what the region would have without your network, not against the day you started — the region grows, and holding congestion flat through growth is the harder achievement.

  3. Carbon Cut

    0ttoday · net tonnes avoided today
    200,280tneeded · net tonnes of CO₂ a year

    Scaled to this metro's 10,014,009 residents at 0.02 tonnes each — roughly what moving a few percent of the region's driving onto rail saves, after the trains are charged for their own power.

  4. Held the Lineheld for a year

    0%today · on time, before a train runs
    80%needed · on time · 65% satisfied · a year in surplus

    All three at once. The cheapest route to a surplus is cutting the service that produces the other two, so this is the condition that cannot be bought.

  5. Within Reach

    0%today · within a walk of your stops
    10%needed · of the metro within a kilometre of a stop

    The operating rail is already in the model, so coverage does not start at nothing. The bar is a tenth of the metro within a walk, or 60% more than you inherit, whichever is higher.

  6. Ten Minutes Back

    0%today · cut so far
    10%needed · off the average regional commute

    Measured on every resident, including the people who never board a train — a network that takes cars off the road shortens the drive for everyone left on it. The day-one average is the model’s first solve.

Carbon Cut's bar is 0.02 net tonnes a year for each resident, floored at 20,000. Transit Capital, coverage and the commute are taken from the network you inherit: where the pack seeds operating rail, from that system's first solve; where it does not, Transit Capital uses the published NTD share (floored at 1% and capped at 6%) and coverage starts from nothing. The gauges' Transit Capital tick is the published share either way.

What you are given

What you are given

Every one of Los Angeles's 2,495 census tracts arrives with its real numbers attached: resident population, population 18 and over, occupied households, jobs by sector at the workplace, resident workers, and median household income — each one hoverable, each one carrying its GEOID so you can go and check it against the Census yourself.

Work trips are not guessed. They are seeded from the observed LEHD LODES home-to-work flows between those tracts, so the real spatial structure of the region — a century of geography, zoning and history that no gravity model reproduces — is preserved, and the model predicts only the change your network causes.

Los Angeles's operating rail — 6 lines, 113 stops — is seeded into the playable network from the agency's published GTFS: the lines run, they cost money to operate, and riders board them. Local bus is drawn on the map and stays decoration. A 1920 start inherits the dated streetcar, elevated and interurban map from OpenHistoricalMap QLever, not today's GTFS with the year filed off.

What makes it hard

What makes Los Angeles hard

Punishing. Spread thin, built for the car, and unforgiving of a line drawn in the wrong place. You are inheriting a system, which means you inherit its shape and its operating cost as well as its riders.

And the decade changes the problem, not the vehicle list. Los Angeles in 1960 is a different city from Los Angeles in 2025: smaller, denser, fewer cars per household, no federal transit money at all, and an expectation that you cover your own operating cost. The population distribution is back-cast by pivoting the real 2020 distribution rather than invented, so the rivers and the rail yards and the university stay where they are. The inherited map for that decade is the archival alignment that was open then — OpenHistoricalMap QLever — not a modern line that had not been built.

Los Angeles is in the free rotation. One of thirteen metros that take turns as the week's free assignment — the whole demand model, the operating budget, the events, the strike, the land use and the full progression ladder, in 2025, for five years. Not a cut-down demo: the same simulation.

Play Los Angeles

Sources

How the model turns these into riders, with every mechanic named →