Interurban / 79 metros / Boston

Massachusetts · NortheastCensus 2020 tractsFree rotationSteam · Mac · Windows

Boston

America’s oldest subway, a street pattern that predates the grid, and a river through the middle. Constrained in every direction, which is why it works.

Existing transit 21 rail lines · 261 stops · MBTA · 86 bus routes drawn, not counted
Boston: the 21 rail lines and 261 stations the pack starts with, with 86 bus routes drawn underneath, over the metro's water and major roadsArlington Center - Lechmere StationArlington Center - Lechmere StationArlington Heights - Harvard StationArlmont Village - Harvard StationAshmont Station - Forest Hills StationAshmont Station - Norfolk Street LoopAshmont Station - Ruggles Station via Talbot AvenueAshmont Station - Ruggles Station via Washington StreetAvon Square - Ashmont StationBabcock Street - Back Bay (Shuttle)Bedford VA Hospital - Alewife StationBelmont Center - Harvard via Concord AvenueBelmont Center - Harvard via Huron AvenueBrighton Center - Ruggles StationCentral Square, Cambridge - Broadway StationCentral Square, Lynn - Haymarket or Wonderland StationChelsea Station - South StationChestnut Hill - Kenmore StationCity Point - Arlington StationCity Point - Chauncy Street & Summer StreetCity Point - Copley SquareCity Point - Otis Street & Summer StreetClarendon Hill - Lechmere StationClarendon Hill or Davis Station - Sullivan Square StationCleary Square - Forest Hills StationDedham Mall - Forest Hills StationDedham Mall or Stimson Street - Forest Hills StationDesign Center - South StationElm Street - Wellington StationFields Corner Loop via Neponset AvenueFields Corner Station - Andrew StationFields Corner Station - Ruggles StationForest Hills Station - Andrew Station or Harbor PointForest Hills Station - Back Bay StationForest Hills Station - Nubian StationFranklin Park - Ruggles StationHarbor Point - Kenmore StationHarvard Square - Lechmere StationHarvard Square - Nubian StationHarvard Square - Nubian StationHarvard Square - Reservoir StationHingham Depot - Quincy Center StationHoughs Neck - Quincy Center Station via GermantownJackson Square Station - Ruggles StationKenmore - Back Bay (Shuttle)Lebanon Loop - Wellington StationLiberty Tree Mall - Central Square, Lynn via Peabody SquareLinden Square - Harvard Square via SullivanLinden Square - Wellington StationLogan Airport Terminals - South StationLovell Corners - Quincy Center StationMalden Center Station - Airport StationMalden Center Station - Sullivan Square Station via Winter HillMarblehead - Wonderland Station via Humphrey StreetMarket Place Drive or Waltham Center - University ParkMattapan Station - Forest Hills Station via Cummins Highway and Roslindale SquareMattapan Station - Forest Hills Station via Morton StreetMattapan Station - Ruggles StationMedford Square - Harvard StationMillennium Park or VA Hospital - Forest Hills StationNorthgate Shopping Center - Central Square, LynnNubian Station - South StationNubian Station - Temple PlaceOak Square - Kendall/MIT StationOrient Heights Station - Jeffries PointPoint Shirley - Orient Heights Station via Revere StreetPoint Shirley - Orient Heights Station via Winthrop CenterQuincy Center Station - Ashmont Station via West QuincyRindge Avenue - Central Square, CambridgeRuggles Station - Park Street StationSalem Depot - Wonderland or Haymarket StationSalem Depot - Wonderland StationSilver Line Way - South StationSullivan Square Station - Central Square, CambridgeSullivan Square Station - Downtown via Bunker Hill StreetWakefield Avenue & Truman Parkway - Ashmont StationWalpole Center - Forest Hills StationWatertown Square - Harvard StationWatertown Yard - Kenmore StationWaverley Square - Harvard StationWest Medford or Arlington Center - Sullivan Square StationWeymouth Landing - Quincy Center StationWolcott Square - Forest Hills StationWonderland Station - Maverick StationWonderland Station - Wellington StationWoodlawn - Haymarket StationCapeFLYERFairmount LineFall River/New Bedford LineFitchburg LineFoxboro Event ServiceFramingham/Worcester LineFranklin/Foxboro LineGreenbush LineHaverhill LineKingston LineLowell LineNeedham LineNewburyport/Rockport LineProvidence/Stoughton LineGreen Line BGreen Line CGreen Line DGreen Line EMattapan LineBlue LineOrange LineRed Line25 km
  • Local bus
  • CapeFLYER 2013
  • Fairmount Line 1979
  • Fall River/New Bedford Line 2025
  • Fitchburg Line 1845
  • Foxboro Event Service
  • Framingham/Worcester Line 1834
  • Franklin/Foxboro Line 1835
  • Greenbush Line 2007
  • Haverhill Line 1837
  • Kingston Line 1997
  • Lowell Line 1835
  • Needham Line 1853
  • Newburyport/Rockport Line 1838
  • Providence/Stoughton Line 1835
  • Green Line B 1897
  • Green Line C 1897
  • Green Line D 1959
  • Green Line E 1941
  • Mattapan Line 1929
  • Blue Line 1904
  • Orange Line 1901
  • Red Line 1912

Bus, Commuter rail, Light rail, Metro — lines, stops and colours from the operating agency's published GTFS, opening years where the feed or the record gives one. Water: Census TIGERweb hydrography. Roads: FHWA HPMS, the busiest classes. 3,155,919 residents in 745 census tracts, Census 2020.

#Facts, figures, history

Boston, as the pack records it.

Population by decennial census, as recorded in the pack.
YearPopulation
19201,832,955
19302,113,886
19402,159,818
19502,353,492
19602,540,327
19702,737,509
19802,623,763
19902,678,461
20002,805,511
20102,895,958
20203,155,919

The pack's census series in Suffolk, Middlesex and Norfolk runs from 1,832,955 residents in 1920 to 3,155,919 in 2020.

The census tracts cover 3,295 km², about 958 residents per km², with 2,016,901 jobs at the workplace.

The pack seeds 21 playable rail/BRT/ferry lines, 86 bus lines drawn on the map, 1 other mode. Framingham/Worcester Line opened in 1834; Fall River/New Bedford Line opened in 2025.

Difficulty is Forgiving.

✓What winning here takes

Six ways to win Boston, each set by Boston.

There is no score to beat. Each condition is computed from the metro as you inherit it, with the engine's own arithmetic; these are the bars the game will set on day one in Boston, in 2025. The blue tick is where the city stands today; the red band is where it has to get to. The run continues after you win.

  1. Transit Capitalheld for a year

    5.0%today · published share; the game uses day one
    5.0%needed · hold the inherited share, for a year

    The region's existing system carries about 5.0% of all trips. The operating rail is in the model; in the game the bar is what that system carries on day one, held for a year.

  2. Roads Unclogged

    0%today · relief before you build
    10%needed · cut in peak congestion

    Against what the region would have without your network, not against the day you started — the region grows, and holding congestion flat through growth is the harder achievement.

  3. Carbon Cut

    0ttoday · net tonnes avoided today
    63,118tneeded · net tonnes of CO₂ a year

    Scaled to this metro's 3,155,919 residents at 0.02 tonnes each — roughly what moving a few percent of the region's driving onto rail saves, after the trains are charged for their own power.

  4. Held the Lineheld for a year

    0%today · on time, before a train runs
    80%needed · on time · 65% satisfied · a year in surplus

    All three at once. The cheapest route to a surplus is cutting the service that produces the other two, so this is the condition that cannot be bought.

  5. Within Reach

    0%today · within a walk of your stops
    10%needed · of the metro within a kilometre of a stop

    The operating rail is already in the model, so coverage does not start at nothing. The bar is a tenth of the metro within a walk, or 60% more than you inherit, whichever is higher.

  6. Ten Minutes Back

    0%today · cut so far
    10%needed · off the average regional commute

    Measured on every resident, including the people who never board a train — a network that takes cars off the road shortens the drive for everyone left on it. The day-one average is the model’s first solve.

Carbon Cut's bar is 0.02 net tonnes a year for each resident, floored at 20,000. Transit Capital, coverage and the commute are taken from the network you inherit: where the pack seeds operating rail, from that system's first solve; where it does not, Transit Capital uses the published NTD share (floored at 1% and capped at 6%) and coverage starts from nothing. The gauges' Transit Capital tick is the published share either way.

What you are given

What you are given

Every one of Boston's 745 census tracts arrives with its real numbers attached: resident population, population 18 and over, occupied households, jobs by sector at the workplace, resident workers, and median household income — each one hoverable, each one carrying its GEOID so you can go and check it against the Census yourself.

Work trips are not guessed. They are seeded from the observed LEHD LODES home-to-work flows between those tracts, so the real spatial structure of the region — a century of geography, zoning and history that no gravity model reproduces — is preserved, and the model predicts only the change your network causes.

Boston's operating rail — 21 lines, 261 stops — is seeded into the playable network from the agency's published GTFS: the lines run, they cost money to operate, and riders board them. Local bus is drawn on the map and stays decoration. A 1920 start inherits the dated streetcar, elevated and interurban map from OpenHistoricalMap QLever, not today's GTFS with the year filed off.

What makes it hard

What makes Boston hard

Forgiving. Dense, centred, and already used to transit — the model has something to work with on day one. You are inheriting a system, which means you inherit its shape and its operating cost as well as its riders.

And the decade changes the problem, not the vehicle list. Boston in 1960 is a different city from Boston in 2025: smaller, denser, fewer cars per household, no federal transit money at all, and an expectation that you cover your own operating cost. The population distribution is back-cast by pivoting the real 2020 distribution rather than invented, so the rivers and the rail yards and the university stay where they are. The inherited map for that decade is the archival alignment that was open then — OpenHistoricalMap QLever — not a modern line that had not been built.

Boston is in the free rotation. One of thirteen metros that take turns as the week's free assignment — the whole demand model, the operating budget, the events, the strike, the land use and the full progression ladder, in 2025, for five years. Not a cut-down demo: the same simulation.

Play Boston

Sources

How the model turns these into riders, with every mechanic named →